Puddle Bridge

Do You Have A Bridge Construction Project We Can Help With?

Scope Of Work

  • Removal and disposal of the existing timber bridge
  • Construction of a two lane concrete structure, approximately 34.9 metres in length with prestressed concrete girders supported on steel “H” piles
  • Environmental controls
  • Asphalt concrete repaving
  • Roadway and drainage improvements
  • Road realignment

Project Details

LOCATION

Black Point, Halifax County, NS

CLIENT

St. Margaret’s Bay Area Rails to Trails Association (SMBARTA)

PROJECT TYPE

Project Gallery

Request A Call Back

The nature of our work often requires a conversation, leave us some info below and we will be back in touch as soon as our office opens.

  • This field is for validation purposes and should be left unchanged.