Puddle Bridge
Do You Have A Bridge Construction Project We Can Help With?
Scope Of Work
- Removal and disposal of the existing timber bridge
- Construction of a two lane concrete structure, approximately 34.9 metres in length with prestressed concrete girders supported on steel “H” piles
- Environmental controls
- Asphalt concrete repaving
- Roadway and drainage improvements
- Road realignment
Project Details
LOCATION
Black Point, Halifax County, NS
CLIENT
St. Margaret’s Bay Area Rails to Trails Association (SMBARTA)
PROJECT TYPE
Request A Call Back
The nature of our work often requires a conversation, leave us some info below and we will be back in touch as soon as our office opens.

